Process Overview

Three steps deliver success.

Cogen Power Technologies (Cogen) uses a three step process to evaluate, design, and build cogeneration plants that meet Customer needs at a value engineered cost.

Step One: Phase One CHP Feasibility Study

The first step in the process is for Cogen to perform a Phase One CHP feasibility study. The intent of this effort is to quickly assess whether or not the Customer’s site meets the fundamental requirements necessary for successfully implementation of a Combined Heat and Power (CHP) Plant, and if the benefits derived from the CHP Plant meet the customers financial, environmental, operational, and community needs.

The deliverables of this effort are:


Step Two: Phase Two CHP Feasibility Study - Design Development and Project Cost

Now that the Customer has decided to move forward in the process, Cogen prepares preliminary designs to make major equipment selections, determines how best to seamlessly integrate the new CHP plant into the existing boiler plant, and obtains major subcontractor pricing. During this phase, Cogen engages the local utility in discussions to ensure there are no “Show Stoppers” regarding the electrical interconnection of the CHP Plant to the utility’s electrical distribution system. Cogen also determines if the natural gas service has sufficient capacity to supply the new plant.

Cogen’s operational experience is factored into this step. Cogen’s in-house CHP Plant Operational Staff carries out a thorough review of the design approach and interacts with the customer’s facility staff to systematically resolve any existing plant issues with the implementation of the new CHP Plant.

Cogen’s design-builder affiliate, Bette & Cring Construction Group, will be engaged in this phase to provide value in the construction component of the effort to ensure the most cost effective building solution.

Cogen will conduct a thorough financial savings analysis that highlights the estimated annual savings projections, the simple payback of the investment, the net present value of the investment, an assessment of what type of subsidies are available, and a high level review of the potential investment tax credits and depreciation benefits the customer may be able to benefit from.

Finally, Cogen will provide a Project Schedule and Cost for the Customer with an Owner’s Program. The Owner’s Program defines the scope of the project, the assumptions used to develop the schedule and cost, and the responsibilities of the Design Build Team and Customer.

Step Three: Design, Build, and Commission the CHP Plant

The Cogen Team – including its design partner and construction affiliate – will now methodically design, build, and commission the CHP Plant. An experienced Construction Project Manager will manage the overall project with a Technical Project Manager to drive the design, procurement, and installation of the major MEP equipment.

Bi-weekly customer meetings will be held upon contract placement through CHP plant turnover. This ensures Customer involvement throughout the project.

Management of the local utility electrical interconnection project is a key component of this effort and is closely monitored by our Electrical Interconnection Expert.

Cogen firmly believes that a third-party Commissioning Agent should develop and lead the overall plant test plan and independently confirm that all functionality has been successfully tested. This provides the customer with an additional level of comfort that the plant will perform as planned.